Contact Us

NB Weather

Search the Site

City Offices
18100 Upper Bay Road
P.O. Box 58448
Nassau Bay, TX 77258
281.333.4211


How to get here

Planned Unit Development

PUDThis proposed planned unit development (dated january 11, 2008) has been submitted by Griffin Partners pursuant to the City of Nassau Bay ordinances related to a Planned Unit Development (PUD). The purpose of the PUD is to

  • Provide a flexible approach for the developer to provide the mixed uses required by the City,
  • Allow a more flexible response to the market, encourage innovative land use and site plan design, and
  • Promote superior development which is compatible with adjacent land uses.

This PUD application is for a Conceptual Development Plan with the Multi-Family Development (Parcel D) being the initial development of the phased development. For each subsequent phase of the development, Griffin Partners will provide information per Section 16.7-810(a) through 810(c) of the Appendix A - Zoning Ordinance.

Note: the files are large and will take some time to download

PLANNED UNIT DEVELOPMENT DOCUMENT (Sections I, II, III Text)

Section I Exhibits

A. Area Map
B. Jurisdictional Exhibit
C. Project Legal Description
D. Site Plan
E. Site Synopsis
F. Adjacent Zoning
G. Land Uses
H. Arterial Plan
I. Traffic Impact Summary
J. Public Utilities Plan - Proposed Water Line
    J1. - Public Utilities Plan - Proposed Sanitary Sewer Line
    J2. - Public Utilities Plan - Proposed Storm Sewer
K. Drainage Plan
L. Hardscape Plan
    L1. - Hardscape Character Images
    L2. - Lighting Character Images
    L3. - Site Furniture Character Images
M. Rendering - Saturn Promenade Site Appearance
    M1. - Rendering - Retail Architectural Character
    M2. - Rendering - Office Architectural Character
    M3. - Rendering - Office/Garage Architectural Character
N. Materials and Colors
O. Signage - Elevations and Dimensions
P. Landscape Plan
    P1. - Plant Material List
    P2. - Landscape Character Images

Section I Scaled Drawing

    D2. Site Plan

Section I Backup Documents

Traffic Impact Analysis
    Tab 1
    Tab 2
    Tab 3
    Trip Generation For Apt
Backup For Utility Calculations
New Utility Lines Calculations

Section II Backup Documents

Development Guidelines
Declaration of Covenants, Conditions, Restrictions and Easements

Section III Exhibits

A. Site Plan (Plot Plan) With Synopsis
    A1. - Synopsis
B. Hardscape Plan & Landscape Plan
    B1. - Point Lookout Entry Monument Plan
    B2. - Point Lookout Entry Monument Elevation
    B3. - Tree Preservation Plan
C. Building Elevation (Point Lookout Road) Color
    C1. - Building Elevations
    C2. - Building Elevations
    C3. - Building Elevations
D. Material and Color Choices
E. Rendering - Appearance from Point Lookout Road
    E1. - Rendering - Appearance along Space Park Drive
F. Drawing – Designated Open Spaces
G. Diagram/Rendering of Screening - at South Property Line
H. Details/Rendering – Entry Stoops
    H1. Detail - Entry stoop set back inrelation to Space Park Drive
I. Public Utilities Plan - Proposed Water Line
    I1. - Public Utilities Plan - Proposed Sanitary Sewer Line
    I2. - Public Utilities Plan - Proposed Storm Sewer
J. Drainage Plan
K. Floodplains Plan
L. Sight-line\Vertical Dimensions Drawings
    L1. - Sight-line drawing (detail)
    L2. - Sight-line drawing (detail)

Section III Scaled Drawing

    A2. Site Plan - Residential



Return to Top

Last updated 2/19/2008

2008 © City of Nassau Bay